New industrial shed

The new industrial site includes the office building, exterior landscaping and utility works to connect the site with the main road system. The chromatic checkerboard lightens the geometric rigor of the structure and echoes the red color used for the finishes, assigning coherence and dynamism to the architecture.
Residential
The residential settlement gives fulfillment to a larger urban design. The intervention articulates the building bodies in increasing volumes from the smallest, street-facing one to the largest and most impactful one: the gradualness of the roofs and the backward position of the building, which represents the largest building, mitigate the perception of the added buildings. […]
Residential

Privileged views of the lake and privacy of the interior. These are the two housing ca- ratures contem- pted in Rinaldo Scaioli and Andrea Melloni’s project. The site of the private villa takes on ancient materials, to which Scaioli’s craftsmanship ensures elegant modern finishes. The openings’ splays, chimneys, and the course of the ground-floor porches […]
City Hall

The renovation renews the municipal headquarters, founded on the late 19th century, recovering its ancient spaces to new efficiency. The intervention operates on two fronts: to preserve the existing building, indeed designing a garden to ennoble its architectural perception; to place side by side a modern and functional structure that is immediately distinguishable from the […]
Apartments – Shops

IDEAL FOR INVESTORS We have stores and apartments (complete with basement and garage) for rent. Excellent rents, guaranteed! New, high-visibility real estate–ideal for those who want to invest their capital without risk or uncertainty about product depreciation.
Energy Requalification in Arese

Building renovation work aimed at energy upgrading of a residential building in the Municipality of Arese. The project involved the structure in its entirety: from the workmanlike removal of the eternit from the roof to the construction of a new wooden load-bearing structure, coupled with insulated sandwich panels with a tile-holding profile; from the replacement […]
City Hall

The intervention involved the complete renovation of the municipal building by equipping it with new facilities for its modernization making it usable for people with reduced mobility.The work included the construction of the new spaces to be used as archives, a new technological central unit capable of providing for the various needs of the facility, […]
United Hospitals

Located close to the hospital’s historical complex is the plate related to operating rooms and related services to accompany the operating activities.The structure fits as an appendage to the existing body of the hospital of which it does not exceed the height and takes up the colors of its facades all to better fit into […]
Parsonage

The work involved the complete demolition of the historic building adjacent to the parish church, replacing it with the construction of the oratory, catechism classrooms and the parish priest’s apartment in one building.Indicatively, the new construction traced the site of the old building going to create a structure more in keeping with the demand for […]
Elementary school, year 1965-1966

The school building used as an elementary school is located at the side of the town square and at the end of the historic center, resulting in a “hinge element” between the old core of the town and the new construction.The building is of the low-body type with an elongated floor plan by arranging classrooms […]