Next to the parish complex, an old rustic courtyard lies untied, falling down and abandoned. It is from this horizon that the project of a complete renovation arises, capable of regaining the compactness and usefulness of spaces. The Enterprise takes
Next to the parish complex, an old rustic courtyard lies untied, falling down and abandoned. It is from this horizon
The manhole in the Pudiga Creek, the last tributary of the Olona River, is being consolidated and completed without construction activity interrupting tramway passage over the bridge above.The excellent ergotechnical management thus directs the work in conjunction with the maintained
The manhole in the Pudiga Creek, the last tributary of the Olona River, is being consolidated and completed without construction
The renovation intervenes to completely restore a small portion of Milan’s historic center, not far from the basilica of Sant’Ambrogio. The overall elegance of the composition is thus recovered: the narrow façade on the street is restored while the wide
The renovation intervenes to completely restore a small portion of Milan’s historic center, not far from the basilica of Sant’Ambrogio.
The gymnasium is conformed to both sports and school use, as well as other complementary activities with public attendance. The building consists of a main volume containing the sports activity space with the stands reserved for the public, and two
The gymnasium is conformed to both sports and school use, as well as other complementary activities with public attendance. The
At the same time as the residential development “The Tower,” the former office building, which was once functional for the disused factory, is being renovated.The building is adapted as a multipurpose space for serving citizens.Ennobled by the arched opening, the
At the same time as the residential development “The Tower,” the former office building, which was once functional for the
Recovery plan for the construction of a residential complex on the disused area where a large manufacturing complex once stood, of which the chimney has been preserved, which is perfectly integrated into the project, so much so that it has
Recovery plan for the construction of a residential complex on the disused area where a large manufacturing complex once stood,
The second lot intervention complements the existing building and converts its spaces to a day care center for the elderly.The general technological makeover and rearrangement of the interior rooms respond to the adaptation of the facility to the new uses.Short
The second lot intervention complements the existing building and converts its spaces to a day care center for the elderly.The
Scanzi Palace The building, overlooking Piazza San Pietro Martire in the center of Monza, is a building of high historical standing. The renovation work safeguarded the historical features of the facade, particularly the window surrounds, portals, and stonework. Internally, structural
Scanzi Palace The building, overlooking Piazza San Pietro Martire in the center of Monza, is a building of high historical
The construction of the soccer field also includes the delivery of bleachers, locker rooms and janitor house. Serving the residential neighborhood, the camp is easily recognizable from the street as it has no boundary walls.The lawn succeeds in enjoying the
The construction of the soccer field also includes the delivery of bleachers, locker rooms and janitor house. Serving the residential
The building stands tower-like in a recently expanded neighborhood with a primarily residential vocation. The overhangs of the concrete balconies differ from the plaster of the facade, moving the lines of an otherwise strongly compact and staggered volume. The color
The building stands tower-like in a recently expanded neighborhood with a primarily residential vocation. The overhangs of the concrete balconies
The multipurpose building is being renovated, preserving the architectural rhythm: the three store arches on the ground floor, the balcony on the first and the five sober windows on the second. Not far from the places of the aristocracy and
The multipurpose building is being renovated, preserving the architectural rhythm: the three store arches on the ground floor, the balcony
The new residential building is multi-story. Not far from Brianteo Stadium, also a Schiavi construction site, the complex stands out according to order, compactness and sobriety. Brick cladding and reinforced concrete that punctuates both balconies and stairwells characterize the building.
The new residential building is multi-story. Not far from Brianteo Stadium, also a Schiavi construction site, the complex stands out
The radical urban redevelopment intervention strongly characterized the context in which the building was placed, as it provided the neighborhood and, more broadly, the entire municipality of Lovere with various services. The complex, characterized by an articulated but traditional-looking structure,
The radical urban redevelopment intervention strongly characterized the context in which the building was placed, as it provided the neighborhood
The building declares in the articulation of forms its public purpose. The volumes converge toward the central raised floor, and the overhangs of the supporting structure enrich the facade. Blind fronts and the use of exposed brick and concrete give
The building declares in the articulation of forms its public purpose. The volumes converge toward the central raised floor, and
Construction of the new middle school in the municipality of Meda, located in the neighborhood where the other school facilities are located. The school is presented as a single building, arranged on two levels, articulated on the front located to
Construction of the new middle school in the municipality of Meda, located in the neighborhood where the other school facilities
The construction of three school buildings in the hamlets of Mediglia (Mombretto, Bu- stighera and Triginto) perfects the city places devoted to public education. The architectures emerge for their modern and sometimes exuberant lines, celebrating in these forms free and
The construction of three school buildings in the hamlets of Mediglia (Mombretto, Bu- stighera and Triginto) perfects the city places
The gymnasium is executed in completion of an ambitious project, fulfilled in successive construction sites. The construction employs traditional materials such as plaster and brick, blending into the context.The gymnasium thus rises in harmonious continuity with the volumes already built,
The gymnasium is executed in completion of an ambitious project, fulfilled in successive construction sites. The construction employs traditional materials
Next to the parish complex, an old rustic courtyard lies untied, falling down and abandoned. It is from this horizon that the project of a complete renovation arises, capable of regaining the compactness and usefulness of spaces. The Enterprise takes
Next to the parish complex, an old rustic courtyard lies untied, falling down and abandoned. It is from this horizon
The manhole in the Pudiga Creek, the last tributary of the Olona River, is being consolidated and completed without construction activity interrupting tramway passage over the bridge above.The excellent ergotechnical management thus directs the work in conjunction with the maintained
The manhole in the Pudiga Creek, the last tributary of the Olona River, is being consolidated and completed without construction
The renovation intervenes to completely restore a small portion of Milan’s historic center, not far from the basilica of Sant’Ambrogio. The overall elegance of the composition is thus recovered: the narrow façade on the street is restored while the wide
The renovation intervenes to completely restore a small portion of Milan’s historic center, not far from the basilica of Sant’Ambrogio.
The gymnasium is conformed to both sports and school use, as well as other complementary activities with public attendance. The building consists of a main volume containing the sports activity space with the stands reserved for the public, and two
The gymnasium is conformed to both sports and school use, as well as other complementary activities with public attendance. The
At the same time as the residential development “The Tower,” the former office building, which was once functional for the disused factory, is being renovated.The building is adapted as a multipurpose space for serving citizens.Ennobled by the arched opening, the
At the same time as the residential development “The Tower,” the former office building, which was once functional for the
Recovery plan for the construction of a residential complex on the disused area where a large manufacturing complex once stood, of which the chimney has been preserved, which is perfectly integrated into the project, so much so that it has
Recovery plan for the construction of a residential complex on the disused area where a large manufacturing complex once stood,
The second lot intervention complements the existing building and converts its spaces to a day care center for the elderly.The general technological makeover and rearrangement of the interior rooms respond to the adaptation of the facility to the new uses.Short
The second lot intervention complements the existing building and converts its spaces to a day care center for the elderly.The